The draining capability of flammable in the APU compartment is determined by the draining holes size in APU compartment. According to the quantitative requirement for APU compartment drainage in AC NO. 25. 863-1,the preliminary method for the APU compartment draining holes size is given. The method is validated by the corresponding data of certain aircraft,the result is reasonable.
参考文献
相似文献
引证文献
引用本文
刘林,王栋. APU舱排液孔大小确定的初步方法[J].民用飞机设计与研 究,2011(4):21-Liu Lin, Wang Dong. The Design and Calculate for Some Movement Step of Civil Aircraft Trailing Edge Flap[J]. Civil Aircraft Design and Research,2011,(4):21-. ( in Chinese)